Answer ALL Questions
PART A – (10 x 2
= 20 Marks)
1. Define
estimate?
2. Explain
about revised estimate?
3. Define
detailed estimate?
4. Define
plinth area?
5. Define
quantity surveyor?
6. What
are the basic principles of report writing?
7. Write
a report on a residential building?
8. Write
a report on a construction of a cuvert?
9.
Write a report on a road construction?
10. Define report preparation?
PART
B (5x15=80 Marks)
1.
Report on estimates for the construction of residential building?
2.Report on estimates
for the construction of medical building?
3. Explain in detail
Types of estimte?
4. Problem
a)
Earth
work
b)
R.C.C
c)
Earth
filling
d)
P.C.C
e)
painting
5. Problem
a)
Brick work
b) Plastering
c) Room
inter plastering
d) Painting
e) Tile
work for floor
0 Comments