RO6703
TOTALLY
INTEGRATED AUTOMATION, Final year, Department of Robotics and Automation Engineering,
Model Exam Questions
PART A (10x2=20)
1. Write the different components of
TIA?
2. What is the difference between PLC
and PAC? Why PAC is preferred for process industries
3. List any six requirements of HMI for
Industrial Automation with an example.
4. Differentiate between Internal and
External Tags with a practical example
5. Compare WinCC RT with WinCC RC.
6. Define Project Library and Global
Library in SCADA. Write the importance of both.
7. What is the use of generating .XDB
files in WinCC RT Provisional?
8. Write the difference between
Distributed Control System and SCADA system.
9. Draw and explain OSI model for TCP /
IP and Profibus.
10.
What is X-Y Graph and Trend? Give two examples for each in Industrial
Automation
PART B (5x16=80)
11. Draw the
architecture of Totally Integrated Automation and briefly explain the components
used in Field Level. (16)
12. Explain the HMI
configuration procedure with a neat flow diagram for any one typical
application. (16)
13.
Explain SCADA Screens, features, and configurations required for Modern
Wind-Farm, Smart-Grid, and Renewable
applications. (16)
14. Explain with a suitable example how OPC
Solves automation’s data connectivity problem. (16)
15.
Draw the block diagram of a commercial Distributed Control System and explain
its basic elements. Write the advantages
of Distributed Control Systems. (16)
0 Comments