RO6703 TOTALLY INTEGRATED AUTOMATION, Final year, Department of Robotics and Automation Engineering, Model Exam Questions

PART A (10x2=20)

1. Write the different components of TIA?
2. What is the difference between PLC and PAC? Why PAC is preferred for process industries
3. List any six requirements of HMI for Industrial Automation with an example.
4. Differentiate between Internal and External Tags with a practical example
5. Compare WinCC RT with WinCC RC.

6. Define Project Library and Global Library in SCADA. Write the importance of both.
7. What is the use of generating .XDB files in WinCC RT Provisional?
8. Write the difference between Distributed Control System and SCADA system.
9. Draw and explain OSI model for TCP / IP and Profibus.
10. What is X-Y Graph and Trend? Give two examples for each in Industrial Automation

PART B (5x16=80)

11. Draw the architecture of Totally Integrated Automation and briefly explain the components used in Field Level.                                                                                                                                    (16)
12. Explain the HMI configuration procedure with a neat flow diagram for any one typical application.                                                                                                                                                        (16)
13. Explain SCADA Screens, features, and configurations required for Modern Wind-Farm, Smart-Grid,                              and Renewable applications.                                                                                                   (16)
 14. Explain with a suitable example how OPC Solves automation’s data connectivity problem.        (16)
15. Draw the block diagram of a commercial Distributed Control System and explain its basic elements.  Write the advantages of Distributed Control Systems.                                                                 (16)